Lam Supply Lumber Yard - Brooklyn, NY
The Challenge
The owners of Lam Supply needed a suitable vapor barrier for their new 20,000sf lumber yard in an existing building as required by NYC DEP and the Office of Environmental Remediation (OER) to mitigate and stop the migration of potentially harmful vapors through the existing concrete floor. They needed a solution that would keep them on schedule for putting the building into service while also ensuring that their employees and anyone else who visited the yard would be protected from the hazardous vapors.
The owners of Lam Supply needed a suitable vapor barrier for their new 20,000sf lumber yard in an existing building as required by NYC DEP and the Office of Environmental Remediation (OER) to mitigate and stop the migration of potentially harmful vapors through the existing concrete floor. They needed a solution that would keep them on schedule for putting the building into service while also ensuring that their employees and anyone else who visited the yard would be protected from the hazardous vapors.
|
The Solution
ECI’s 4EVERCRETE liquid-applied vapor barrier system was chosen for the job due to its proven track record of resolving vapor issues for the EPA and OER. The owner applied the 4EVERCRETE system by following our easy application procedures. This allowed the owner to leave the existing concrete slab in place saving time and money. They now have peace of mind that they are protected from the hazardous vapors.
ECI’s 4EVERCRETE liquid-applied vapor barrier system was chosen for the job due to its proven track record of resolving vapor issues for the EPA and OER. The owner applied the 4EVERCRETE system by following our easy application procedures. This allowed the owner to leave the existing concrete slab in place saving time and money. They now have peace of mind that they are protected from the hazardous vapors.